Enabling Engineering
Swanton Consulting delivers enabling engineering solutions that unlock complex construction and demolition projects with precision, safety, and efficiency. Our approach is rooted in technical rigour, vast experience and a deep understanding of site-specific constraints.
We specialise in the design and coordination of temporary works and enabling packages that support critical phases of construction, including:
- Pre-construction support and engineering reports
- Pile mat and working platform design
- Tower crane bases, grillages, and tie systems
- Gantry and logistics slab design
- Structural assessments and stability checks
- Contractor delegated design elements
Our enabling engineering services are designed to integrate seamlessly with permanent works, ensuring full coordination and avoiding clashes later in the programme. We work closely with contractors, design teams, and approving authorities to deliver compliant, buildable, and cost-effective solutions.
With extensive knowledge across commercial, residential, infrastructure, and industrial sectors—including sensitive environments such as nuclear and pharmaceutical sites—we provide bespoke engineering that supports safe mobilisation, sequencing, and execution.
By engaging Swanton early, clients benefit from value-engineered strategies that reduce risk, streamline approvals, and enhance project viability.
Sample Projects:
- 22 Hanover Square, Mayfair
Swanton designed complex temporary works for a three-level basement excavation, integrating top-down construction and high-capacity propping to protect adjacent structures. The team also coordinated with party wall engineers and incorporated permanent elements early to support logistics and crane loads.
- One Sherwood Street, Soho
Swanton supported the £250M redevelopment with temporary works for demolition, low-headroom piling, and retention of the iconic Piccadilly Lights. The team used 3D modelling and phased sequencing to manage complex structural constraints and heritage elements.
- Stanhope Gate, London W1
Swanton provided demolition and construction phase engineering, including deep basement enabling works and a bespoke façade retention scheme. The project required precise coordination due to decorative features, underground vaults, and minimal movement tolerances.
Swanton is committed to sustaining partnerships
Our teams across the UK and Ireland are always on the lookout for new opportunities and new ways to help make a success of brilliant projects.

Why choose Swanton Consulting?
Our expertise ensures that original building façades are maintained safely and effectively, allowing for modern developments without compromising historical or aesthetic value.
Expertise
With years of experience in façade retention, our team possesses the knowledge and skills to handle complex projects with precision.
Customized solutions
We understand that each project is unique and offer tailored solutions that meet specific requirements and challenges.
Commitment to quality
Our focus on quality ensures that all projects are executed to the highest standards, maintaining the integrity and safety of retained façades.
Collaborative approach
We work closely with clients, architects, and construction teams to ensure seamless project execution and successful outcomes.